For training dogs on recall, or allowing dogs a roam in the park, or the beach, while still maintaining lead control.
Folds neatly to hang conveniently from belt loop when not in use.
Medium Snap Hook
SIZE: 19mm wide; 5 metres long
$ 0.00
$ 33.95
For training dogs on recall, or allowing dogs a roam in the park, or the beach, while still maintaining lead control.
Folds neatly to hang conveniently from belt loop when not in use.
Medium Snap Hook
SIZE: 19mm wide; 5 metres long
$ 68.35
$ 52.58
$ 75.00
$ 61.99
$ 45.99
$ 27.00
$ 10.99
$ 46.99
$ 14.11
$ 29.99
$ 21.90
$ 10.95
$ 67.26
$ 51.74
$ 17.00